Our Projects

Ongoing

Mansehra-Muzaffarabad

Feasibility Study and Detailed Design of Mansehra-Muzaffarabad Expressway (CPEC link) (26.6 Km Approx.)

Completed

Lahore –Abdul Hakeem Motorway

Detailed Design and Construction Supervision of Karachi – Lahore Motorway (KLM), Section – III Lahore – Abdul Hakeem Section (230 Km)

Completed

Mansehra-Muzaffarabad- Mangla

Feasibility Study and Preliminary Design for Mansehra-Muzaffarabad-Mirpur-Mangla (N- 5) Expressway (241 KMs)

Ongoing

Kalkatak-Chitral

Improvement and Widening of Chakdara- Chitral Road Project (N-45), Section-Ill: Kalkatak to Chitral (48.0) Km.

Completed

Mashkhel-Gamilandi

Feasibility Study, Detailed Design for Construction of Road from Mashkhel to Gamilandi on Taftan – Quetta Road (102 Km)

Completed

Lahore-Islamabad Motorway (M-2)

Overlay and Modernization of Lahore-Islamabad Motorway (M-2) on BOT Basis

Ongoing

Malakand Tunnel

Design, Tendering Assistance and Construction Supervision Services for Malakand Tunnel Construction Project

Completed

Habibabad Flyover

Design and QA/QC Services of Construction of Habibabad Flyover on BOT Basis

Ongoing

Islamabad Expressway

Detailed Design and Construction Supervision for Development of Signal Free & Controlled Access Corridor of Islamabad Expressway from Zero Point to G.T. Road, Islamabad (24 KM)

Ongoing

Upgradation of Railway Track ML-3

Detailed Design for Upgradation of Track on ML-3: Rohri-Sibi-Quetta-Koh-e-Taftan Section

Ongoing

Hoshab-Awaran

Design Review and Construction Supervision of Hoshab – Awaran – Khuzdar Section of M-8 Project, Package-l: Hoshab - Awaran (146 KM)

Completed

Rawal Chowk Flyover/Interchange

Design Review (Up-dation) and Construction Supervision of Rawal Chowk Flyover/Interchange, Islamabad

Ongoing

Awaran-Naal

Design Review and Construction Supervision of Hoshab-Awaran-Khuzdar: Section of M-8 Project Section-2: Awaran-Naal, Length 168Km

Ongoing

Gilgit-Shandoor

Feasibility Study, Detailed Design and Construction Supervision of Gilgit – Shandoor Road Length: 216 KM

Completed

Basima-Khuzdar

Design Review and Construction Supervision for Construction of Basima – Khuzdar Road (N-30) (106 KM)

no status

Mansehra-Naran-Jalkhad

Feasibility Study and Detailed Design for Upgrading of Existing National Highway (N-15) MansehraNaran-Jalkhad-Chilas to a 4-Lane Divided Expressway (235 Km. Approx.)

Ongoing

Peshawar-Torkham

Detailed Design, Contract Administration and Construction Supervision for Construction of Peshawar – Torkham Expressway (PTEX) including Southern Link Road

Completed

Lahore Ring Road

Engineering Procurement, Construction, Finance, Operation and Maintenance of Lahore Ring Road (Southern Loop, SL-1 & SL-2) under BOT Model (Approx. Length 22.4 Km.)

Completed

Sakrand-Nawabshah Road

Detailed Design and Construction Supervision for Dualization of Sakrand – Nawabshah Road (18+979.60 Km)

Ongoing

Sambrial-Kharian Motorway

Detailed Design and Quality Control (QC) Services for Engineering, Procurement, Construction, Finance, Operation and Maintenance of (Sialkot) Sambrial-Kharian Motorway (69 Km.) 4-Lane Controlled Access Facility under Build-Operate and Transfer (BOT) Model

Completed

Karak-Kohat Road

Design Review and Construction Supervision for Dualization & Improvement of Karak to Kohat Section of Indus Highway N-55 (67 Km)

Completed

Kot Balian to Tarap

Design Review and Construction Supervision of Kot Balian Road to Tarap, Package-3 (52 Km), Section of Hakla (M-1) – Yarak (DI Khan) Motorway

Completed

Rehmani Khel to Kot Balian Road

Design Review and Construction Supervision of Rehmani Khel to Kot Balian Road, Package 2 (60 Km), Section of Hakla (M-1) – Yarak (DI Khan) Motorway

Completed

Karachi-Hyderabad Motorway (M-9)

Design and QA/QC Services of Construction of Karachi-Hyderabad Motorway on BOT Basis

Completed

Malir Expressway

Detailed Design of Malir Expressway 39.4 Km on BOT Basis

Completed

Pindi-Bhattian-Faisalabad Motorway (M-3)

Detailed Design of 53 Km Pindi-Bhattian – Faisalabad Motorway Project M3

Completed

Bosan Road Multan

Design Review, Value Engineering and Construction Supervision for Widening/ Improvement of Bosan Road, Multan

Completed

Kala Shah Kaku

Design Review and Construction Supervision of 6- Lane Highway from Kala Shah Kaku to Lahore Ring Road (Lahore Eastern Bypass) Approx. Length 16.06 Km.

Completed

Mughalkot-Kato Dabara Road

Feasibility Study Cum Design Mughalkot – Kato Dabara Section (N-50)

Completed

9 th Avenue, Islamabad

Detailed Design & Construction Supervision for Grade Separated Arrangement at Intersection of 9th Avenue with Khayaban-e-Iqbal (Shaheen Chowk), Islamabad

Ongoing

10th Avenue, Islamabad

Detailed Design and Construction Supervision for Construction of 10th Avenue, Islamabad

Completed

11th Avenue, Islamabad

Detailed Design & Construction Supervision for Grade Separated Arrangement at Intersection of 11th Avenue with Khayaban-e-Iqbal (E-11 Chowk), Islamabad

no status

Khushalgarh Bridge

Design Review and Construction Supervision of Khushalgarh Bridge - Project Length 2.8 KM which includes 358m Long Bridge

Completed

Bridge at Diamer Basha Dam

Design & Supervision Services for the Construction of 01 No. Permanent Bridge with necessary arrangements for Diamer Basha Dam Project (Contract MW-1)

Completed

Fata Road Network

Detailed Design & Construction Supervision Services for FC Package Roads Network FATA (Federally Administrative Tribal Area) Approx. 234.705 Km

Completed

Shahdara Flyover

Feasibility Study Cum Design Proposal for Shahdara Flyover on BOT Basis

Completed

DHA Interchange, Islamabad

Detailed Design and Construction Supervision of DHA Interchange on Islamabad Expressway, Islamabad

Completed

Koral Interchange

Detailed Design and Construction Supervision of Koral Interchange on Islamabad Expressway

Completed

Gwadar-Lasbella Roads

Design and Construction Supervision of 100 Km Road in Gwadar & Lasbella Districts

Completed

I-8 Interchange, Islamabad

Detailed Design and Construction Supervision of I-8 Interchange on Islamabad Expressway

Completed

T-Chowk Flyover, Islamabad

Detailed Design and Construction Supervision of T. Chowk Flyover on Islamabad Expressway

Completed

Samtskhe-Javakheti Road, Georgia

Design Review and Construction Supervision Consultant for Samtskhe-Javakheti Road Rehabilitation Project

Completed

Nazareth-Assela-Dodla, Ethiopia

Design Review and Construction Supervision of Nazareth-Assela-Dodla and Shashemene-Goba Road up-gradation Project (199.25 KM.)

Completed

Kisumu to Kitalc Road, Kenya

Design Review and Construction Supervision of Kisumu to Kitalc Road

Ongoing

Lahore-Sialkot Motorway (LSM)

Quality Assurance/Quality Control (Construction Supervision Services) of Lahore – Sialkot Motorway (LSM) Project on BOT Basis Approx. Length 91.425 Kms

Completed

Storm Water Drainage Network

Vetting of already Executed Works and Planning, Design and Supervision of Leftover Storm Water Drainage Network in DHA, Karachi (80 Km Drainage Network with Marine Pumping at Sea)

Completed

Rohtas Fort

Drainage Design for Rohtas Fort, Jhelum

Completed

Water Desalination Plant

Detailed Design and Supervision of 2 MGD Water Desalination Plant at Gwadar

Completed

Drinking Water Supply Scheme

Feasibility Study and Detail Design of Drinking Water Supply Scheme (Gravity / Pumping base) for UC Agra in Tehsil Bathkhela District Malakand

Completed

Drinking Water Supply Scheme

Feasibility Study and Detail Design of Drinking Water Supply Scheme (Gravity Water Supply Scheme Tehsil Sama Ranizai Dargai) District Malakand

Completed

Winder Dam

Detailed Design and Construction Supervision of Winder Dam Project, Baluchistan

Completed

SHOAIBA PP

Financial Close for 6800 MW Shoaiba Power Project–KSA (largest standalone thermal powerproject)-USD 4.4 billion

Completed

UCH-II PP

Financial Close for Uch–II Combined Cycle Power Project–USD 505 million. First IPP in Pakistan to receive IDB Financing

Completed

HALMORE

Financial Close for 225 MW Combined Cycle Halmore Project–USD 265 million–First IPP in Pakistan with local EPC

Completed

RANOLIA HPP

Developed template for EPA on Take & Pay Basis for 17 MW Ranolia HPP

Completed

PEHUR HPP

Developed template for EPA on Take & Pay Basis for 17 MW Pehur HPP

Completed

DARAL KHWARHPP

Developed template for EPA on Take & Pay Basis for 43 MW Daral Khwar HPP

Completed

MACHAI HPP

Developed template for EPA on Take & Pay Basis for 2.60 MW Machai HPP

Completed

GWADAR PP

Tarif and Generation Licenses for 300 MW CCCC–Coal fired Power Project at Gawadar

Completed

BALAKOT HPP

Review & identification of grey areas, improvement in the feasibility, Sector Assessment, Financial Management Assistance, Redesign and Preparation of PC-1 and Tender Documents for 300 MW Balakot Hydropower Plant

Completed

COAL FIRED PROJECT GWADAR

Analysis of the cost estimates, review of the COAL FIRED PROJECT GWADAR technical bids, Assessment of the Tariff Petition submitted to NEPRA, Development of financial model, Project agreement, Financial Close, Owner Services for 300 MW CCCC Coal Fired Project Gwadar

Completed

404 MWUCH-II PP

Tarif and Generation Licenses for 404 MW Uch-II Combined Cycle Power Project

Completed

225 MWHALMORE PP

Tarif and Generation Licenses for 225 MW Halmore PowerProject

Zeeruk in Collaboration with Proje Limited has successfully delivered a wide range Urban Planning, Housing and Mixed Used Development Project of National and Internationally. The company specializes in developing Housing Schemes, Smart Cities, Industrial Zones, Special Economic Zones, and Mixed-Use Developments.

Completed

BAHÇEŞEHİR URBAN PLANNIG MASTER PLAN PROJECT

Completed

SABİHA GÖKÇEN AIRPORT EXTENTION & SATELLITE CITY

Completed

CORFU ISLAND DELUXE SETTLEMENTS MASTER PLAN

Completed

DHA CITY KARACHI

Master Planning of DHA City Karachi North (DHA Indus Hills) (9500 Acres)

Completed

DHA PESHAWAR

Revision of Town Planning & Detailed Infrastructure Design Works at DHA Peshawar (Approx. 10,000 Kanal)

Completed

DHA QUETTA

Master Planning and Designing of DHA Quetta (Approx. 10,000 Acres)

Completed

INFRASTRUCTURE DEVELOPMENT

Designing, Procurement and Detailed Construction Supervision of Infrastructure Development Work at Sector F-12, Islamabad

Completed

INFRASTRUCTURE DEVELOPMENT

Designing, Procurement and Detailed Construction Supervision of Infrastructure Development Work at Sector G-12, Islamabad

Completed

MOUZA THALIAN HOUSING SCHEME

Federal Government Employees Housing Scheme Measuring Approximately 7000 Kanals, at Mouza Thalian

Completed

NHA HOUSING SOCIETY

Preliminary Master Planning on 312 Acres of Land of National Highway Housing Society

Completed

PAKISTAN RANGERS HOUSING SOCIETY

Master Planning, Design and Project Management of Pakistan Rangers Housing Society

Completed

MIXED-USE HIGH RISE PROJECT

Mixed-Use High Rise Project on Ferozpur Road Lahore on area of (90 Kanals)

Completed

RESORT HOMES & APARTMENTS

Resort Homes and Apartments at Basoi Bara Kahu (Murree)

Completed

CHANGLA HOUSING COLONY

Master Planning, Design and Project Management of Changla House Colony, Murree

Completed

SERVICE APARTMENTS

Burbhan Five Story Service Apartments Spread Over 4 Acres of Land at Murree

Zeeruk in Collaboration with Proje Limited, Turkey has delivered a diverse portfolio of Residential, Commercial, Hospitality, Healthcare and Mixed Used Development Projects across Pakistan and International market and delivered Residential & Commercial Buildings, Hospitals, Schools & Universities, Sports and Community Facilities.

Completed

HOTEL & RESIDENCIAL BUILDING

Arjan Twin Towner Hotel Project

Completed

HOTEL & RESIDENCIAL BUILDING

Baku Hotel Town Project

Completed

HOTEL & RESIDENCIAL BUILDING

Krasnodar Hotel & Residential Tower Project

Completed

HOTEL & RESIDENCIAL BUILDING

Krasnodar Hotel & Residential Tower Project

Completed

HOTEL & RESIDENCIAL BUILDING

Astana Tower

Completed

HOTEL & RESIDENCIAL BUILDING

360 Rotating Tower Project

Completed

HOTEL & RESIDENCIAL BUILDING

Kusadasi Adakule Hotel Project

Completed

HOTEL & RESIDENCIAL BUILDING

Kurdasi Adakule Hotel

Completed

HOTEL & RESIDENCIAL BUILDING

X Tower Hotel Almaty

Completed

HOTEL & RESIDENCIAL BUILDING

Award Winning Project

Completed

HOTEL & RESIDENCIAL BUILDING

Award Winning Project

Completed

HOSPITAL -HEALTHCARE

Kayseri Research and Education Hospital 1200 Beds Capacity

Completed

FARM HOUSE

Farm House at H-9 Islamabad

Completed

OFFICE BUILDING & COMMERCIAL COMPLEX

EOBI Commercial Complex at I-8 Markaz, Islamabad

Completed

OFFICE BUILDING & COMMERCIAL COMPLEX

Ongoing

Peshawar-Torkham

ESIA & RAP Study of Peshawar-Torkham Expressway (PTEX) Project under (Khyber pass Economic Corrdor KPEC)

Ongoing

Upgradation of Railway Track ML-3

ESIA of ML-3 Rohri-Sibi-Quetta Section & SpezandAlam Reg-Koh e Taftan Section

no status

Mansehra-Naran-Jalkhad

Environmental Impact Assessment-Mansehra-NaranJalkhad-Chilas Expressway

Ongoing

Sambrial-Kharian Motorway

Environmental Impact Assessment (EIA) for Construction of Sialkot (Sambrial) – Kharian Motorway (69 Km), 4-Lane Access Controlled Facility under PPP on BOT Basis

Completed

Karachi-Hyderabad Motorway (M-9)

Environmental Impact Assessment (EIA) for Karachi – Hyderabad Motorway (M-9) National Highway (N-5) Link Road Project on DFBOT Basis

Completed

Lahore-Islamabad Motorway (M-2)

Environmental Impact Assessment (EIA) for Overlay and Modernization of Islamabad – Lahore Motorway (M-2) under Build-Operate and Transfer (BOT) Basis (357 Km.

Ongoing

Kalkatak-Chitral

Environmental Impact Assessment (EIA) for Improvement and Widening of Chakdara-Chitral Road Project (N-45), Section-Ill: Kalkatak to Chitral (48.0 Km)

Completed

Lahore Ring Road

Environmental Impact Assessment (EIA) for Detailed Design, Construction For Design, Financing, Construction, Operation & Maintenance of the Southern Loop (30.4) Km. of LAHORE RING ROAD PROJECT

Ongoing

Islamabad Expressway

Environmental Impact Assessment of Development of Signal Free & Controlled Access Corridor of Islamabad Highway from Zero Point To G.T Road, Islamabad

Completed

Lahore –Abdul Hakeem Motorway

Environmental Impact Assessment of Karachi Lahore Motorway (KLM) Section-III (Abdul Hakeem – Lahore)

Completed

Mashkhel-Gamilandi

Environmental Impact Assessment of Noukundi Mashkhel Road, Balochistan (Mashkhel to Gamilandi On Taftan – Quetta Road (102 Km)

Ongoing

Mansehra-Muzaffarabad

Environmental Impact Assessment of Mansehra Muzafarabad Expressway (CPEC Link) – MMMM

Ongoing

Gilgit-Shandoor

Environmental Impact Assessment of Gilgit-Shandoor Road

Ongoing

Hoshab-Awaran

Design Review and Construction Supervision of Hoshab-Awaran-Khuzdar: Section of M-8 Project Section-2: Awaran-Naal, Length (168Km)

Ongoing

Gilgit-Shandoor

Design Review and Construction Supervision of Gilgit – Shandoor Road Length: 216 KM

Ongoing

Peshawar-Torkham

Design Review, Contract Administration and Construction Supervision for Construction of Peshawar – Torkham Expressway (PTEX) including Southern Link Road

Completed

9 th Avenue, Islamabad

Detailed Design & Construction Supervision for Grade Separated Arrangement at Intersection of 9th Avenue with Khayaban-e-Iqbal (Shaheen Chowk), Islamabad

Completed

11th Avenue, Islamabad

Detailed Design & Construction Supervision for Grade Separated Arrangement at Intersection of 11th Avenue with Khayaban-e-Iqbal (E-11 Chowk), Islamabad

Ongoing

Kalkatak-Chitral

(Detailed Design, Construction Supervision & Contract Administration) for Improvement and Widening of Chakdara-Chitral Road Project (N-45), Section-Ill: Kalkatak to Chitral (48.0 Km) - Funded By: Korea EDCF through NHA

Ongoing

Sambrial-Kharian Motorway

Detailed Design and Quality Control (QC) Services for Engineering, Procurement, Construction, Finance, Operation and Maintenance of (Sialkot) Sambrial-Kharian Motorway (69 Km.) 4-Lane Controlled Access Facility under Build-Operate and Transfer (BOT) Model

Completed

Karachi-Hyderabad Motorway (M-9)

for Detailed Design and QA/QC Services of Karachi – Hyderabad Motorway (M-9) National Highway (N-5) Link Road Project on DFBOT Basis

Ongoing

Hoshab-Awaran

for Design Review and Construction Supervision of Hoshab – Awaran – Khuzdar Section of M8 Project, Package-l: Hoshab - Awaran (146 KM)

Completed

Basima-Khuzdar

Design Review and Construction Supervision for Construction of Basima – Khuzdar Road (N30) (106 KM)

Completed

Karak-Kohat Road

Design Review and Construction Supervision for Dualization & Improvement of Karak to Kohat Section of Indus Highway N-55 (67 Km)

Ongoing

Lahore-Sialkot Motorway (LSM)

Quality Assurance/Quality Control (Construction Supervision Services) of Lahore – Sialkot Motorway (LSM) Project on BOT Basis Approx. Length 91.425 Kms

Completed

Rehmani Khel to Kot Balian Road

Design Review and Construction Supervision of Rehmani Khel to Kot Balian Road, Package-2 (60 Km), Section of Hakla (M-1) – Yarak (DI Khan) Motorway

Completed

Kot Balian to Tarap

Design Review and Construction Supervision of Kot Balian Road to Tarap, Package-3 (52 Km), Section of Hakla (M-1) – Yarak (DI Khan) Motorway

Completed

Lahore –Abdul Hakeem Motorway

Detailed Design and Construction Supervision of Karachi – Lahore Motorway (KLM), Section – III Lahore – Abdul Hakeem Section (230 Km)

Completed

Lahore Ring Road

Engineering Procurement, Construction, Finance, Operation and Maintenance of Lahore Ring Road (Southern Loop, SL-1 & SL-2) under BOT Model (Approx. Length 22.4 Km.) (Value Engineering of Existing Design, Quality Control, Quality Management, Project Management Services)

Ongoing

Malakand Tunnel

Design, Tendering Assistance and Construction Supervision Services for Malakand Tunnel Construction Project

Ongoing

Islamabad Expressway

Detailed Design and Construction Supervision for Development of Signal Free & Controlled Access Corridor of Islamabad Highway from Zero Point to G.T. Road, Islamabad (24 KM)

Completed

Habibabad Flyover

Design and QA/QC Services) of Construction of Habibabad Flyover on BOT Basis

Completed

Lahore-Islamabad Motorway (M-2)

Design and QA/QC (Construction Supervision) Services) of Overlay and Modernization of Islamabad–Lahore Motorway (M-2) on BOT Basis (357 Km.)

Completed

Sakrand-Nawabshah Road

Detailed Design and Construction Supervision for Dualization of Sakrand – Nawabshah Road (18+979.60 Km) (Feasibility Study, Detailed Design and Construction Supervision Services)

Completed

Gwadar-Lasbella Roads

Design and Construction Supervision of 100 Km Road in Gwadar & Lasbella Districts

Completed

Kisumu to Kitalc Road, Kenya

Design Review and Construction Supervision of Kisumu to Kitalc Road - Kenya Road Authority, Kenya

Completed

Samtskhe-Javakheti Road, Georgia

Design Review and Construction Supervision Consultant for Samtskhe-Javakheti Road Rehabilitation Project - Millennium Challenge Corporation (“MCC”) – Georgia

Completed

Nazareth-Assela-Dodla, Ethiopia

Design Review and Construction Supervision of Nazareth-Assela-Dodla and Shashemene-Goba Road up-gradation Project (199.25 KM.) - Ethiopian Roads Authority - Addis Ababa, Ethiopia

Ongoing

Sambrial-Kharian Motorway

Transaction Advisory Services (Tas), Detailed Design and Quality Control (QC) Services for Engineering, Procurement, Construction, Finance, Operation and Maintenance of (Sialkot) Sambrial-Kharian Motorway (69 Km.) 4-Lane Controlled Access Facility under Build-Operate and Transfer (BOT) Model

Completed

Karachi-Hyderabad Motorway (M-9)

Transaction Advisory Services (Tas), Engineering Consultancy Services for Detailed Design and QA/QC Services of Karachi – Hyderabad Motorway (M-9) National Highway (N-5) Link Road Project on DFBOT Basis

Ongoing

Lahore-Sialkot Motorway (LSM)

Transaction Advisory Services (Tas), Quality Assurance/Quality Control (Construction Supervision Services) of Lahore – Sialkot Motorway (LSM) Project on BOT Basis Approx. Length 91.425 Kms

Completed

Lahore Ring Road

Transaction Advisory Services (Tas), Engineering Procurement, Construction, Finance, Operation and Maintenance of Lahore Ring Road (Southern Loop, SL-1 & SL-2) under BOT Model (Approx. Length 22.4 Km.)

Completed

Habibabad Flyover

Transaction Advisory Services (Tas) for Construction of Habibabad Flyover on BOT Basis

Completed

Lahore-Islamabad Motorway (M-2)

Transaction Advisory Services (Tas) for Overlay and Modernization of Islamabad–Lahore Motorway (M-2) on BOT Basis (357 Km.)